AMC
Showing posts with label Vacuum Circuit Breaker. Show all posts
Showing posts with label Vacuum Circuit Breaker. Show all posts
Thursday, 21 June 2012
Tuesday, 19 June 2012
Pre-Planned Preventive Maintenance of Vacuum Circuit Breaker (VCB)
For the preventive maintenance of the VCB following points needs to be taken care of:-
Vacuum Circuit Breaker (VCB)
1. Checking of ON/OFF operation.
2. Checking of Vacuum interrupter.
3. Cleaning and providing lubricants on movable mechanical parts.
4. Testing of relays through secondary injections if required.
5. Tripping, testing of VCB, through over current and earth fault relay if required.
6. Testing of auxiliary relays if required.
7. Tripping of VCB through Buckhloz Relay/OTI/WTI if required.
8. Tripping of VCB through primary injection if required.
9. Testing of CT’s, through primary Injection kit.
10. Testing of PT.
1. Checking of ON/OFF operation.
2. Checking of Vacuum interrupter.
3. Cleaning and providing lubricants on movable mechanical parts.
4. Testing of relays through secondary injections if required.
5. Tripping, testing of VCB, through over current and earth fault relay if required.
6. Testing of auxiliary relays if required.
7. Tripping of VCB through Buckhloz Relay/OTI/WTI if required.
8. Tripping of VCB through primary injection if required.
9. Testing of CT’s, through primary Injection kit.
10. Testing of PT.
11. Checking of all control wiring.
12. Testing of Contact resistance of VCB’s.
13. Testing of timing, closing/ Opening & between closing / opening.
Subscribe to:
Posts (Atom)