| PPM-Performance Check list | ||||
| Check for loose connections in the bus bar and tighten wherever required | ||||
| Check input & output point of MCCB for heating | ||||
| Blow out dust from the cubicle and switchgear | ||||
| Check earth system throughly | ||||
| Check and ensure correct operation of all the indicating lamps, meters | ||||
| Ensure that the cables are not overheated. | ||||
| Ensure Three phase current | ||||
| Ensure that all indication lamps, Meter working properly | ||||
| Ensure that all thimble & connector check for heating | ||||
| Check meter for both reading DHVPN & DG | ||||