| Performance Check list-RTCC Panel | ||
| Check Hooter is working | ||
| Check and clean connection of switchgears and connector, Replace nut/bolt whenever required | ||
| Blow out dust from the panel | ||
| Check & ensure earth continuity | ||
| Ensure that the cables insulation is not damaged | ||
| ensure that the heater is working | ||
| Check auto/mannual operation of relay | ||
| Recharge panel after through check | ||
| Check Potentail Transformer | ||
Sunday, 24 June 2012
PPM-RTCC panel
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment