PPM-Primary Pump(Mechanical) |
Ensure standby pumps are in opeartion, if required |
Apply Lock In & tag Out notice |
Performance Check list |
Inspect condition of shaft seal and for any leaks by operating pump suction & discharge valve |
If shaft seal is leaking, disconnect coupling and replace mechanical seal or repack seal |
Check mechanical coupling |
Lubricate motor and pump bearings |
Check operating pressures from guage , if any , to ensure clean strainer. Clean pump strainer |
Check tightness of foundation bolt |
Replace guards, cover and Check noise/vibration |
Check for any kind of corrosion & treat it. |
Remove cover of motor terminal box and check the termination and for any overheating |
Check for any loose connection and tighten it properly |
Check running load curent for all three phases |
Checklist for safety inspection on completion of PM |
Remove Tag Out |
Clean and check that no tools are left on the pump/motor |
Inspection and Test Results |