| PPM-Primary Pump(Mechanical) |
| Ensure standby pumps are in opeartion, if required |
| Apply Lock In & tag Out notice |
| Performance Check list |
| Inspect condition of shaft seal and for any leaks by operating pump suction & discharge valve |
| If shaft seal is leaking, disconnect coupling and replace mechanical seal or repack seal |
| Check mechanical coupling |
| Lubricate motor and pump bearings |
| Check operating pressures from guage , if any , to ensure clean strainer. Clean pump strainer |
| Check tightness of foundation bolt |
| Replace guards, cover and Check noise/vibration |
| Check for any kind of corrosion & treat it. |
| Remove cover of motor terminal box and check the termination and for any overheating |
| Check for any loose connection and tighten it properly |
| Check running load curent for all three phases |
| Checklist for safety inspection on completion of PM |
| Remove Tag Out |
| Clean and check that no tools are left on the pump/motor |
| Inspection and Test Results |