Performance Check list | |||||
Check for loose connections and tighten wherever required | |||||
termination socket wherever required | |||||
Check DB Box & Lock | |||||
Check for any sparking spots in DP wherever applicable. | |||||
Blow out dust from the panel. | |||||
Check & ensure earth continuity. | |||||
Ensure current in earch outgoing circuit not more than 60% of DP rating. | |||||
Check and ensure that panel working normal. | |||||
Check for connector for heating & any physical brake | |||||
Check physical status of Pole light glass/blub/Reflector/Dumb | |||||
Check cleanning of Pole light glass/blub/Reflector/Dumb | |||||
Sunday, 24 June 2012
PPM-Pole Light
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment