PPM Checklist:-Light D.B
Check for loose connections in the terminations and tighten wherever required | |||||||
Check & clean connection of switchgears & replace nut/bolts & cable termination socket wherever required | |||||||
Check for any sparking spots in TPN/ MCB/ELCB wherever applicable. | |||||||
Blow out dust from the DB | |||||||
Check & ensure earth continuity | |||||||
Ensure that the cables are not overheated. | |||||||
Ensure that the cables thimble are not overheated. | |||||||
Ensure current in each outgoing circuit not more than 60% of TPN/MCB/ELCB rating | |||||||