PPM Checkpoints-Secondary Pump(Mechanical) |
Ensure standby pumps are in opeartion, if required |
Apply Lock In & tag Out notice |
Performance Check list |
Inspect condition of shaft seal and for any leaks by operating pump suction & discharge valve |
If shaft seal is leaking, disconnect coupling and replace mechanical seal or repack seal |
Check mechanical coupling |
Lubricate motor and pump bearings |
Check operating pressures from guage , if any , to ensure clean strainer. Clean pump strainer |
Check tightness of foundation bolt |
Replace guards, cover and Check noise/vibration |
Check for any kind of corrosion & treat it. |
Remove cover of motor terminal box and check the termination and for any overheating |
Check for any loose connection and tighten it properly |
Check running load curent for all three phases |
Sunday, 24 June 2012
PPM_Secondary Pump
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment