| PPM Checkpoints-Fire Engine Panel Performance Check list | ||
| Check for loose connections in the bus bar and tighten wherever required | ||
| Check fire engine DB/Relay/Transformer/Connector | ||
| Check for AC Supply/DC Supply | ||
| Check for any hot spots or overheating within the panel and take appropiate action | ||
| Blow out dust from the panel | ||
| Check & ensure earth continuity | ||
| Check for any sparking spots in MCB/MCCB/DP wherever applicable. | ||
| Check & ensure correct setting of Overload relay and time delay relays | ||
| Measure the load current and compare with rated current | ||
| Check for contactor point for heating | ||
| Check Indication Lamp | ||
| Check Auto/Mannual Switch | ||
| Check & ensure Motor connection is tight & not overheated | ||
| Remove signboard | ||
Sunday, 24 June 2012
PPM-Fire Engine Panel
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment