Ensure standby pumps are in opeartion, if required
Apply Lock In & tag Out notice
Performance Check list
Inspect condition of shaft seal and for any leaks by operating pump suction & discharge valve
If shaft seal is leaking, disconnect coupling and replace mechanical seal or repack seal
Check mechanical coupling
Lubricate motor and pump bearings
Check operating pressures from guage , if any ,  to ensure clean strainer. Clean pump strainer
Check tightness of foundation bolt
Replace guards, cover and Check noise/vibration
Check for any kind of corrosion & treat it.
Remove cover of motor terminal box and check the termination and for any overheating
Check for any loose connection  and tighten it properly
Check running load curent for all three phases
Checklist for safety inspection on completion of PM
Remove Tag Out
Clean and check that no tools are left on the pump/motor
Inspection and Test Results