PPM Checklist-Main LT Panel Performance Check list | |||
Check for loose connections in the bus bar and tighten wherever required | |||
Check & clean connection of switchgears & replace nut/bolts & cable termination socket wherever required | |||
Blow out dust from the Feeder | |||
Check ACB of the panel as per ACB check list at least after 12 months. | |||
Check for any sparking spots in MCCB / MCB wherever applicable. | |||
Blow out dust from the cubicle and switchgear | |||
Check earth system throughly | |||
Check and ensure correct operation of all the indicating lamps, meters, KWH meter, power factor meter | |||
Ensure that the cables are not overheated. | |||
Check all CT's for ratings & conditions | |||
Check status of all relays | |||
Recharge panel after through check and switch ON the feeders one by one. |
Sunday 24 June 2012
PPM-Main LT panel
Subscribe to:
Post Comments (Atom)
Electrical Panel Manufacturers
ReplyDeleteMain LT Panel Manufacturers
Transfo Tech Engineering are the manufacturers of transformers in pakistan ..
ReplyDeleteThanks for sharing this very informative blog with us. I read your blog and find out that this is very useful and informative for those people who really need to know about it.
ReplyDeleteElectrical Panel Manufacturers
Main LT Panel Manufacturers
DG Synchronization Panel Manufacturers
Panel Manufacturers
LT Distribution Panel Manufacturers