Sunday 24 June 2012

PPM-HWG (Mech)


PPM Checkpoints-Hot Water Generator
Use pressonel protective gear and carry out shutdown after aking proper care
Apply "Lock Out" and "Tag Out" signboard
 
Performance Check list
Check for any loose connection in the panel
Check and clean connection of switchgears
Check for any hot spots or overheating within the panel and take appropiatr action
Blow out dust from the panel
Check and ensure earth continuty
Check and ensure correct setting of low level current and fuses
Measure the load current and compare with rated current
Check the butterfly valve for operation

No comments:

Post a Comment